Effective flood risk management requires both accurate floodplain maps and informed flood adaptation and flood mitigation strategies.

Note that the table makes reference to several types of reference documents, including Land Use By-Law (LUB) and Municipal Planning Strategy (MPS). A LUB typically regulates land use and development within a municipality, while a MPS provides a policy framework for guiding growth, development, and land use planning.

As an example of the evolution from flood mapping to policy, the findings and recommendations of the Integrated River and Coastal Hydrodynamic Flood Risk Mapping of the LaHave River Estuary and Town of Bridgewater were used in the MPS of the Municipality of Bridgewater to identify the flood hazards along the LaHave River, prompting the Bridgewater Town Council to discourage certain land uses and development in areas at risk of flooding.

The table below provides examples of mitigation and adaptation stragegies used by municipalities across the province in a variety of areas: Planning & Prediction, Zoning Restrictions, Development Standards, Infastructure and Public Works, Nature Based and Envrionmental Restoration, Education, Coordination & Incentives. 

 

Planning and Prediction

Strategy Description Reference Example
Flood Risk Study A commitment to commission, require or rely on a technical study of flood risk, such as a hydrotechnical study or flood risk assessment. The tool produces knowledge about flooding rather than regulating land directly. Cape Breton Regional Municipality LUB s.9.3(c)

Town of Digby MPS s.2.2.1 (Issue 4, Action 2)
Cape Breton Regional Municipality : “Development contrary to Subsection 9.3 b) may be permitted provided a hydrotechnical study, carried out by a qualified person, shows that the proposed development will not contribute to upstream or downstream flooding or result in a change to flood water flow patterns.”

Town of Digby : “Undertake the preparation of a coastal surge and erosion risk assessment and mitigation strategy for the Town.”
Stormwater Management Plan A requirement that a stormwater or drainage management plan be prepared, usually as a condition of subdivision or development approval, showing how runoff from the site will be controlled. It can also be a commitment to prepare a municipality-wide stormwater plan. Municipality of the County of Victoria MPS Policy 4-36

Town of Wolfville LUB s.4.33(1)
Municipality of the County of Victoria: “Council shall, through the Land Use By-law, require a landscaping plan and/or a stormwater management plan for proposals for large industrial and commercial developments to ensure the potential impacts of the proposal are limited and mitigated.”

Town of Wolfville : “An application for a Development Permit for a new development that is not regulated by an existing Development Agreement and Servicing Agreement or a renovation that changes the footprint of the building or lot drainage patterns shall include a Lot Grading Plan and Stormwater Management Plan in accordance with the Town of Wolfville Stormwater Management Design Guidelines.”
Watershed Management Planning Planning at the scale of a watershed or sub-watershed rather than a site: a watershed study, management plan, or protection plan. Halifax Regional Municipality (Regional Plan) MPS Policy E-23

Municipality of the District of Clare MPS Policy Env-10
Halifax Regional Municipality (Regional Plan) : “HRM shall undertake watershed or sub-watershed studies concerning natural watercourses prior to undertaking secondary planning strategies in areas where new or additional development could adversely affect watercourses within the watershed.”

Municipality of the District of Clare: “Council shall adopt through the MPS a generalized watershed map for Clare.”
Flood Mapping Producing, adopting or referring to mapping that delineates flood extent, such as 1:20- and 1:100-year floodplain maps or coastal flood risk maps. Maps are often used to apply flood zones or overlays. Town of Berwick MPS Policy 3.44

Municipality of the District of St. Mary's MPS Policy 2-23
Town of Berwick: “The Town will undertake a floodplain mapping exercise, either individually or in cooperation with other provincial or regional studies, to identify at-risk areas within the Town of Berwick. Until this study is completed, all new residential, commercial or industrial development within the Environmental Designation may require a flood risk assessment study, which shall be completed by a qualified person.”

Municipality of the District of St. Mary's : “Council may work with the Province of Nova Scotia to prepare floodplain mapping for potential flood-prone areas of the Municipality and develop policy consistent with the provisions of the Provincial Statement of Interest on Flood Risk Areas.”
Flood Modelling Hydraulic or hydrologic modelling of how water moves during a flood, and the design-storm data that feeds it. Models are used to estimate flood elevations and extents, including under climate change. Town of Truro MPS Policy ES-1

Municipality of the County of Colchester MPS Policy 4-115
Town of Truro : “It shall be a policy of Council to recognize the principles and development standards set out in the 1988 Canada-Nova Scotia Flood Damage Reduction Program and, where appropriate, incorporate these into municipal planning policy and regulations.”

Municipality of the County of Colchester : “Council shall, notwithstanding Policy 4-114, on the maps of the Land Use Bylaw, apply the Flood Way Modification Overlay (E-3) to lands in the area examined under the EDM 1997 Truro Flood Plain Study and having a 1:20 year flood frequency. These lands may be developed using a “cut and fill” procedure described in the Land Use Bylaw.”
Flood Monitoring Recording flood conditions over time — gauges, water-level records, early warning — as opposed to delineating flood extent once. Town of Bridgewater MPS Policy EM-13

Municipality of the County of Colchester MPS Policy 4-138
Town of Bridgewater : “It shall be a policy of Council to consider participating in flood monitoring initiatives, with other levels of government and expert or likeminded organizations, designed to record and evaluate flood event characteristics, frequency and risk along the LaHave River.”

Municipality of the County of Colchester : “Council may consider participating in any flood monitoring initiatives designed to record flood event characteristics and pursuing partnerships with the Town of Truro, the Province of Nova Scotia, Government of Canada, and any other stakeholders having an interest in flood related issues.”

Zoning Restrictions

Strategy Description Reference Example
Environmental Reserve Zoning or designation that sets land aside from development because it is a watercourse, wetland, floodplain or other environmentally sensitive area. Town of Middleton MPS Policy E2

Town of Oxford MPS Policy E-2
Town of Middleton : “Boundaries of the Environmentally Sensitive Area shall generally: follow the 13.7 metre (45 ft) contour [...] adjacent to the Annapolis River and tributary boundary; and be 8 metres (26 ft) from the edge of all other streams, watercourses, and designated wetlands.”

Town of Oxford : “It shall be the intent of Council to ensure that development within the River Philip Open Space is regulated in order to: a) Avoid potential damage to property due to flooding; b) Protect the natural integrity of the River Philip floodplain; c) Protect the water quality of the River Philip.”
Flood Hazard Area: Floodway (1:20) The floodway proper — the channel and the land flooded by the 1-in-20-year event, where development is most tightly restricted. Town of Antigonish LUB s.11.2.2

Municipality of the District of East Hants MPS Policy EN14
Town of Antigonish : “No permanent structures shall be permitted in a High Risk Floodplain (HF) Zone except for Public Works structures associated with the provision of piped services or flood control.”

Municipality of the District of East Hants : “The High Risk Floodplain (HF) future designation shall be carried out and be implemented by the High Risk Floodplain (HF) Zone. Council shall zone lands in the floodway, for portions of the Shubenacadie and Nine Mile Rivers, as High Risk Floodplain (HF).”
Flood Hazard Area: Floodway Fringe (1:100) The outer band of the floodplain — flooded by the 1-in-100-year event but not by the 1-in-20 — where development is usually permitted subject to floodproofing. Town of Annapolis Royal MPS Policy 7.5

Towns of New Glasgow, Pictou, Stellarton, Trenton and Westville (joint by-law) LUB s.52.2.1(a)
Town of Annapolis Royal : “All development within Environmentally Sensitive Area 2 (ESA2) Zone, or the development of lands within the Annapolis River 100 Year Flood Inundation Limit (NSPI Emergency Preparedness Plan 2010, as appended in Appendix 1) shall be considered only by Development Agreement. Proposed development of these lands shall be subject to evaluation and confirmation of suitability by studies, prepared by qualified professionals, relating to their environmental condition. In addition to other criteria and matters provided for in Policy 17.6 (General Criteria for Development Agreements) a development agreement shall contain provisions to mitigate potential impacts on the proposed development resulting from the land’s environmental conditions.”

Towns of New Glasgow, Pictou, Stellarton, Trenton and Westville (joint by-law) : “Based on the Joint Canada/Nova Scotia Flood Plain Mapping of the East River Floodways (circa 1980), expansions to existing uses located within the floodway fringe (1:100 year) are permitted (but not in the floodway (1:20 year)), provided it is flood-proofed, and in compliance with the Statement of Provincial Interest outlined in the MGA.”
Flood Hazard Area: Floodplain zone (single zone) A single floodplain or flood hazard zone or overlay that is not split into floodway and floodway fringe, often used where detailed 1:20/1:100 mapping is not available. Town of Amherst MPS Policy 5-30

Municipality of the County of Antigonish MPS Policy 3-92
Town of Amherst : “Council shall, through the Land Use Bylaw, establish the Flood Plain Zone. The intention of this zone is to prevent most development in areas along Dickey Brook that could be subject to periodic flooding.”

Municipality of the County of Antigonish : “Council shall through the Land Use By-law establish the Flood Hazard Zone Overlay. The complete flood hazard maps developed through the Provincial Municipal Flood Mapping Program will be used to delineate the boundaries of the overlay zone.”

Development Standards

Strategy Description Reference Example
Horizontal (watercourse) setback A minimum horizontal distance, or undisturbed buffer, required between development and a watercourse, wetland or shoreline. Town of Mulgrave LUB Part 5, s.28

Municipality of the District of Barrington LUB s.4.22.1
Town of Mulgrave : “Notwithstanding anything else in this By-Law, all development shall be set back a minimum distance of fifty (50) feet from any watercourse or shoreline; provided however, that wharves and boathouses will be permitted within this set back requirement where a property is adjacent to the shoreline. A ‘minor variance’ from this setback requirement may be considered for lots which predate this By-Law.”

Municipality of the District of Barrington: “In all zones where development is undertaken on a lot which borders a watercourse or the ocean, an undisturbed buffer of 12 metres is required to be maintained between the high-water mark on either side of a watercourse and any structure or developed portion of the lot. Infilling or removal of material is not permitted within the buffer except for minimal disturbance incidental to a permitted undertaking. In the watercourse buffer area the natural flora and fauna is to remain substantially undisturbed except for penetrations for wharves and boat launches. Moderate thinning of tree cover in the buffer area to enable views is permitted and good ecological practices designed to minimize disturbance of natural shoreline areas are encouraged when undertaking all activities within the buffer and all developments on properties abutting watercourses in the Municipality.”
Vertical (elevation) requirement A minimum elevation above which a building, or its habitable floor or openings, must sit. It is set relative to a flood level (e.g., the 1:100-year flood elevation), a geodetic datum (e.g., CGVD2013) or the high-water mark. Region of Queens Municipality MPS Policy 4-11

Municipality of the County of Richmond LUB s.6.34.1
Region of Queens Municipality : “Council shall, through the Land Use Bylaw, prohibit development of buildings below a vertical elevation of 2.8 metres relative to the Canadian Geodetic Datum of 2013. Exceptions shall be made for non-habitable areas of buildings in serviced areas, industrial uses, low-value development (such as sheds and boardwalks), and buildings that functionally depend on access to the water.”

Municipality of the County of Richmond: “All development, with the exception of the following, shall be prohibited within 15.24 horizontal metres (50.0 feet) and 2.5 vertical metres (8.2 feet) of the ordinary high watermark of any watercourse: (a) Boat houses, fishing gear sheds, docks, wharves, piers, and slipways. (b) Fishing uses. (c) Boardwalks, walkways, and trails with a maximum width of 3.0 metres (9.84 feet). (d) Pumphouses. (e) Scientific research structures. (f) Public streets and infrastructure. (g) Development in the Source Water Protection 1 (WP1) Zone. (h) Development in the Fishing Zone (RF) Zone.”
Flood Proofing Construction standards that make a building resistant to flood damage, such as flood-resistant materials and techniques designed by an engineer. Town of Kentville LUB s.10.3.2(b)(i)

Municipality of the County of Kings LUB s.12.7.2(a)
Town of Kentville : “No development permit shall be issued in the Floodway (FW) Overlay for the construction of any new permanent structures except for the following: […] b) expansion or rebuilding of existing structures, subject to the underlying zone, shall: i. where there is an increased risk of flooding, implement adequate flood resistant techniques as designed by an engineer licensed to practice in Nova Scotia; […]”

Municipality of the County of Kings: “In addition to the requirements of the underlying zoning, the Urban Floodplain Overlay shall require the following: (a) New buildings and additions shall be designed and constructed for flood resistance to a storm surge height of 28.2 feet above mean sea level, the approximate height of nearby dyke. These requirements, however are waived for the items noted below. (i) Vertical additions that do not expand the building footprint. (ii) Accessory structures with a maximum building footprint of 150 square feet. (iii) Additions to buildings that existed on October 14, 2010. The addition, however, shall not extend beyond the property boundary that existed on October 14, 2010. The grade of the ground floor must be no lower than the ground floor of the existing building. Basements shall not be permitted.”
Infilling/Grading Control over altering the level, grade or contour of land, usually near watercourses or within flood areas. Municipality of the County of Inverness LUB s.30.3.1

Town of Yarmouth MPS Policy 9.31
Municipality of the County of Inverness: “Where development occurs, no alteration of land levels (filling or excavation) shall occur within 30 m of the Ordinary High Water Mark of a watercourse, except where required for Government Use related structures.”

Town of Yarmouth: “It shall be the intention of Council to prohibit the alteration of land levels or changes to any existing marsh, open ditch, riverbank, watercourse or other natural feature within the Floodplain (O-2) Zone, except for public works developments associated with flood control.”
Cut/Fill Regulating the balance, source or placement of fill in flood areas, so that fill brought in is offset by material removed (“balanced cut and fill”) and floodplain storage is not lost. Municipality of the County of Colchester MPS Policy 4-126

Municipality of the County of Pictou LUB s.5.19.1
Municipality of the County of Colchester: “Council shall, notwithstanding Policy 4-125, apply the “cut and fill” principle to permitted developments in the flood plain that require fill to better accommodate access, parking lots, accessory structures, improved drainage and aesthetics, or other functional site features.”

Municipality of the County of Pictou: “Fill shall not be placed on lands within the Floodway (F1) Zone unless the fill originates from within the Floodway (F1) Zone.”
Sediment and erosion control Measures to control erosion and sedimentation, usually during construction. Town of Lockeport MPS Policy 11(b)

Municipality of the County of Annapolis LUB s.5.5.10.4
Town of Lockeport: “It shall be the intention of Council when considering amendments of the Land Use By-law, and in considering Development Agreements in addition to all other criteria as set out in various policies of this MPS, to have regard to the following matters: [...] (b) That the proposal is not premature or inappropriate or likely to conflict with any other adjacent or nearby land use by reason of: [...] (vi_ type of use, precipitating or contributing to a pollution problem in the area, the potential for the contamination of water courses or the creation of erosion or sedimentation, […]”

Municipality of the County of Annapolis: “Erosion and sedimentation controls shall be required to be implemented during the construction of any development on lands within the LCR1, LCR2, LCR3, LCR4, GW1, GW2, GW3, GW4, and GW5 Zones. Erosion and sedimentation controls shall include the control, disposal, or runoff of water containing suspended material or other harmful substances with the use of siltation fences, sedimentation ponds, diversion ditches, silt curtains, sedimentation blankets, slope stabilization and the like, in accordance with the Nova Scotia Department of Environment and Climate Change Erosion and Sedimentation Control Handbook for Construction Sites.”
Impervious-surface / lot-coverage limit A maximum share of a lot that may be covered by buildings or hard (impervious) surfaces, to limit runoff. Municipality of the County of Cumberland LUB s.13.10.1(c)
Town of Bridgewater MPS Policy G-20
Municipality of the County of Cumberland: “In the Flood Hazard (HzFl) Zone, the Development Officer shall approve a site plan for a single-unit dwelling, recreational vehicle parking sites, or short-term rental where the requirements of this Land Use By-law and the following matters have been addressed: [...] (c) Buildings and Structures (i) No building shall include any portion of a bedroom below grade. (ii) Lot coverage shall not exceed 10 percent. (iii) Main buildings shall include adequate flood-resistant building techniques as designed by an engineer licensed to practice in Nova Scotia. (iv) A total of only one single-unit dwelling, recreational vehicle parking sites, or short-term rental shall be located on the lot.”

Town of Bridgewater : “It shall be a policy of Council to limit the area of impermeable surfaces in all residential development permitted as-of-right in order to reduce heat-island effect and to promote the natural infiltration of stormwater, in accordance with the Land Use By-law.”
Electrical and mechanical design Locating electrical and mechanical building services above the flood level. Cape Breton Regional Municipality LUB s.9.3.2(b)(iii)(b)

Town of Lunenburg MPS Policy 5-3(c)
Cape Breton Regional Municipality : “In addition to the Zone Standards of the relevant zone categories for which the overlay zone is applied, developments are subject to: […] b) Within the Floodway Fringe Area, as identified in Schedule A: […] iii. New construction and expansion of an existing use must be shall: […] b) Locate all electrical and mechanical equipment at a minimum elevation of 1.0 metre above the 1:100 floodplain; […]”

Town of Lunenburg: “Developers of new development within areas identified on the Flood Risk Area Map shall be required to [...] reduce the potential impacts of coastal flooding on the development by: [...] (c) locating vulnerable infrastructure (such as electrical and mechanical systems) above the 3.2 metre (CGVD2013) elevation.”

Infrastructure and Public Works

Strategy Description Reference Example
Storm/wastewater system upgrades Capital works on the piped system: upgrading, separating, expanding or replacing storm and wastewater infrastructure. Town of Stewiacke MPS Policy ICSP-10

Town of Shelburne MPS Policy W3
Town of Stewiacke: “It shall be the policy of Council to maintain the Town's storm sewer system in an efficient manner and to extend the piped storm sewer system into all the serviced areas of the Town as funding permits.”

Town of Shelburne: “It shall be the policy of Council to : 1. Regulate on site stormwater management in the Land Use Bylaw; and 2. Examine ways to upgrade the Town's stormwater infrastructure to address increased precipitation due to climate change.”
Detention/retention facilities Engineered facilities that hold stormwater temporarily (detention) or permanently (retention) and release it slowly, reducing peak flows downstream, such as stormwater ponds and storage tanks. Halifax Regional Municipality (Eastern Passage/Cow Bay) MPS Policy EP-8

Town of Kentville MPS s.11.2.4
Halifax Regional Municipality (Eastern Passage/Cow Bay) : “It shall be the intention of Council to encourage the use of innovative stormwater management systems which reduce the degree of impact on the natural environment. The use of stormwater retention/detention ponds, infiltration trenches, and velocity breaks and other similar techniques are therefore to be encouraged in any new development and in upgrades of existing systems where appropriate.”

Town of Kentville: “The Town of Kentville owns and maintains several components of Stormwater Management such as retention ponds, open drainage ditches, protective berms, flood control pumps, outfalls, storm sewers and associated infrastructure. […] All proposed development and future infrastructure upgrades are reviewed with the above principles in mind prior to approval by the Town of Kentville. Permits for this work may also require review and approval of the Province of Nova Scotia.”
Backup power/emergency equipment Emergency power, such as generators, that keeps pumping stations, treatment plants or critical building systems working during floods and power outages. Town of Port Hawkesbury MPS Policy CD-2.3

Town of Bridgewater MPS Policy LRDA-1(q)
Town of Port Hawkesbury: “It shall be the intention of Council to invest in a generator for the wastewater treatment plant to protect against untreated sewage dumps in the Strait in the event of a prolonged power outage.”

Town of Bridgewater: “It shall be a policy of Council to ensure that the following criteria are met when Council is considering proposals for new development within the LaHave River Development Agreement Area by development agreement: […] (q) For all new buildings, flood-resistant materials such as concrete, ceramic tile, pressure treated and marine-treated plywood, pressure-treated lumber, latex or bituminous, bricks, and metals shall be used below the Safe Building Elevation; an on-site emergency power supply capable of operating critical building systems shall be provided; and ground levels shall incorporate measures to prevent water intrusion; […]”
Flood control: roads, dams, dykes Physical works that hold back or move floodwater, such as dykes, aboiteaux, dams, berms, ditches, culverts and raised roads. West Hants Regional Municipality LUB s.34.4(a)

Municipality of the District of Yarmouth MPS Policy 5-56
West Hants Regional Municipality : “The infilling and alteration of topography of any property in areas shown as Dykeland on Schedule A of this By-law shall not be permitted except as necessary for: (a) construction and maintenance of dykes, aboiteaux, ditches, drains, roads and other works necessary for the prevention of flooding and the protection of dykeland; […]”

Municipality of the District of Yarmouth: “Council shall, through the Land Use By-law, prohibit the development of any building within the Dykeland Zone.”
Permeable surfaces (e.g., pavers) Paving that lets water soak into the ground, such as permeable pavers, porous asphalt or gravel grids, reducing runoff. Municipality of the District of Guysborough LUB s.6.11.3(b)

Town of Mahone Bay MPS Policy 4-35
Municipality of the District of Guysborough: “Permeable pavement and vegetation shall be used, where possible, to minimize surface runoff and the heat island effect caused by paved areas; […]”

Town of Mahone Bay: “Council shall, through the Land Use Bylaw, permit mechanisms to reduce stormwater run-off in Mahone Bay, including pervious pavement and rooftop gardens.”

Nature Based and Environmental Restoration

Strategy Description Reference Example
Green Roof A roof partly or fully covered with vegetation that absorbs rainfall and slows runoff. Town of Bridgewater MPS Policy G-21

Town of Mahone Bay LUB s.5.33.5
Town of Bridgewater: “It shall be a policy of Council to encourage the development of green roofs as part of all commercial, industrial and multi-unit residential development, in accordance with the Land Use By-law.”

Town of Mahone Bay: “Flat roofs and flat-roofed additions may be used as a rooftop garden.”
Rain gardens, swales Shallow planted depressions (rain gardens, bioretention areas) and vegetated channels (swales) that collect, slow and soak up runoff. Town of Truro LUB s.3.5.3, Table 3.21

Municipality of the District of Chester LUB s.4.24.1(a)
Town of Truro: Rain gardens were listed as a stormwater management practice, and defined as “a variation on depression storage and bioretention areas, the rain garden is a deliberately designed landscape, with specific plant species and soil media to receive and detain, infiltrate and filter runoff discharged from roof leaders.”

Municipality of the District of Chester: “Residential developments comprising 12 or more dwelling units; or a commercial, institutional, light industrial or heavy industrial development with a gross floor area over 1,000 m2 or occupying a land area over 6,000 m2 shall submit a storm drainage plan, furnished by a qualified professional, namely an engineer, using stormwater management best practices such that: a) surface runoff from impermeable surfaces, and rooftop runoff from downspouts, shall drain across permeable areas such as yards, vegetated areas or other permeable surfaces, utilizing rain gardens, drainage swales or other stormwater control methods, before entering any watercourse, water body, wetland, stormwater system, or drainage ditch; […]”
Retention ponds and constructed wetlands Permanent ponds or constructed wetlands designed as green infrastructure: they store runoff and also provide habitat and water-quality benefits, unlike purely engineered detention facilities. Municipality of the District of Shelburne MPS Policy 5.3.5

Halifax Regional Municipality (Sackville Drive) MPS Policy I-17 (action plan)
Municipality of the District of Shelburne: “It is the policy of Council to require and promote effective stormwater management practices for all new developments and municipal projects within the Municipality of the District of Shelburne. Stormwater management shall prioritize the protection of natural watercourses, the prevention of flooding, and the minimization of environmental impacts. To the greatest extent possible, new residential subdivisions, industrial and commercial developments shall incorporate stormwater management systems that align with natural drainage patterns, minimize impervious surfaces, and use green infrastructure solutions such as bioswales, rain gardens, and retention ponds where appropriate.”

Halifax Regional Municipality (Sackville Drive) : “Where applicable, the capital and operating budgets shall reflect and conform to the objectives and policies established in the Secondary Planning Strategy. Table 4. […] Naturalize and upgrade the existing stormwater ponds to the quality of a new wetland.”
Wetland and watercourse restoration Restoring or re-creating wetlands, salt marshes, floodplains or watercourses (e.g., daylighting a piped stream) so they can store and slow floodwater. Halifax Regional Municipality (Regional Plan) MPS Policy SU-10

Town of Truro MPS s.12.2.10, including Policy ES-23
Halifax Regional Municipality (Regional Plan) : “Where public stormwater collection infrastructure must undergo significant repair or replacement, HRM may consider supporting funding for daylighting of the watercourse involved with consideration given to: (a) feasibility in relation to the surrounding environment, land use and ownership, adequacy of space, drainage and potential flooding issues, safety and other practical or engineering considerations as appropriate. (b) replacement of culverts with bridges or a three-sided culvert rather than straight pipe is preferred wherever possible; (c) the potential for legal and liability issues arising; and (d) costs and the availability of funding.”

Town of Truro: “Restoration of salt marshes along the Salmon River can help reduce dyke maintenance costs, enhance protection of public and private infrastructure, and increase resilience to climate change through the restoration of a coastal flood plain. Policy ES-23: It shall be a policy of Council to encourage the use of natural barriers such as salt marshes to reduce the risk of coastal flooding and increase resilience to climate change.”
Urban forests Policies to keep, plant or expand trees and tree canopy, which intercept rainfall and reduce runoff. Town of Amherst MPS Policy 5-22

Town of Truro MPS Policy G-57
Town of Amherst: “Council shall, through the Land Use Bylaw, establish tree planting provisions for development to help integrate plantings into the urban environment and to expand the urban tree canopy.”

Town of Truro: “It shall be a policy of Council to prepare an Urban Forest Strategy that inventories and evaluates the existing tree canopy in Town and sets out a plan for the maintenance and expansion of Truro's Urban Forest.”

Education, Coordination and Incentives

Strategy Description Reference Example
Public education and stewardship Programs that inform residents, property owners and developers about flood risk and how to manage stormwater, or that encourage care of watercourses and wetlands. Municipality of the District of Chester MPS Policy E-7

Municipality of the District of Lunenburg MPS Policy 5.4.1
Municipality of the District of Chester: “Council may develop and implement a stormwater management education program, including guidelines to provide the public with information regarding flood risk, stormwater flows, aquifer recharge, water quality and protection of natural habitat.”

Municipality of the District of Lunenburg: “Council will build public awareness about coastal flooding, erosion issues, the protection of coastal ecosystems, and the regulations intended to deal with them. Council will also promote utilizing natural-based solutions such as vegetative buffers and living shorelines.”
Financial incentives (e.g., rebates for sump pumps or rain barrels) A financial or development incentive offered for flood-related action: cash or product rebates, tax or fee relief, stormwater rate credits, or additional development rights. Halifax Regional Municipality (Regional Plan) MPS Policy SU-12

Town of Truro MPS Policy ES-18
Halifax Regional Municipality (Regional Plan): “HRM shall support efforts by Halifax Water to create a rate structure for stormwater management services that provides incentives for the retention of on-site stormwater and may consider any amendments to municipal by-laws which would assist in facilitating these efforts.”

Town of Truro: “It shall be a policy of Council to adopt performance standards for each land use zone that specifies a maximum percentage for impervious surface. Development that exceeds the maximum percentage of impervious surface will be permitted, up to a specified limit, where development implements on-site stormwater retention and maximizes infiltration by incorporating design elements such as: a) permeable pavement; b) infiltration trenches/chambers and bio-retention; c) rainwater harvesting systems in building design; d) green roofs; e) roof drains directed to permeable areas with stormwater infiltration measures in place; and f) utilizing open drainage such as swales.”
Emergency management (EMO) planning Emergency planning by the municipality or its regional Emergency Management Organization (EMO), such as identifying flood-prone areas and preparing emergency response measures. Municipality of the District of Argyle MPS Policy 12.2

Municipality of the District of Digby MPS Policy SPI 2.3
Municipality of the District of Argyle: “It shall be the policy of Council: […] 12.2.3 To support the Emergency Management Organization in planning and development of emergency plans in flood risk areas. […]”

Municipality of the District of Digby: “The Municipality will continue to support the efforts by the Digby Regional Emergency Measures Organization to identify areas subject to potential flood damage risk and the preparation of appropriate emergency response measures.”

 

These tables provides a snapshot of examples from Nova Scotia’s municipalities. It is not an assessment of planning best practices nor appropriate protocols. Examples are quoted from the municipal planning strategies (MPS) and land use by-laws (LUB). These examples cover 48 of Nova Scotia's 49 municipalities (all but the Town of Clark's Harbour).

   Financial support for this project was provided in part by Natural Resources Canada through the Flood Hazard Identification and Mapping Program (FHIMP). We also gratefully acknowledge the funding and support provided by the Government of Nova Scotia through the Municipal Flood Line Mapping Program (MFLMP).