Flood Mitigation

Lorne Street Naturalized Stormwater Management Pond

Lorne Street Naturalized Stormwater Management Pond

Location and Flood Zone Description

The former Town of Sackville, which is now part of the Town of Tantramar, is located in southeastern New Brunswick. The Sackville River watershed is subject to several flood hazards, including riverine and lake flooding.

Flood Zone Mitigation Approach

In 2019, following four major flooding events in five years, the former Town of Sackville constructed a naturalized stormwater pond near Lorne Street (Phase I and II) to store approximately 40,000 m3 of stormwater during major storm events.

The Lorne Street projects encompass stormwater management upgrades to transport the water that normally floods the Lorne Street area and redirect it to the Tantramar River (Town of Sackville, 2019). A picture of the Lorne Street Naturalized Stormwater Management Pond is shown in Figure 7-1.

Phase 1 of the project included the complete road reconstruction of Lorne and Saint James Streets, focusing on upgrading the aged and deteriorated infrastructure.

Phase 2 encompassed the retention pond and stormwater management upgrades to transport the stormwater flows that normally flood the Lorne Street area and redirect them to the Tantramar River.

The anticipated Phase 3 of the project will include:

  • Construction of a new stormwater retention pond;

  • Repurposing the abandoned Pickard Quarry and construction of a new outlet, dyke and control structure to create a stormwater retention pond which will connect to the Town’s existing stormwater infrastructure that leads to Lorne Street;

  • Ditching upgrades and re-alignment, connecting the Lorne Street area to the ponds and subsequently to the Tantramar River;

  • Construction of a new sediment basin in the new ditch upstream of the aboiteau;

  • New culvert installation underneath Canadian National Railway (via jack and bore method); and

  • Installation of new culverts at various roadway crossings (via conventional open trenching methods).

Outcome

In August 2021, more rain fell during a single storm in the former Town of Sackville than in the entire month of August combined. The return period of this storm was less than 1 in 100 years and resulted in isolated incidents of flooding in the Town of Sackville.

The storm also resulted in the Lorne Street pond becoming filled, however reportedly the pond fared well during the storm (Town of Sackville, 2019).

The storm event resulted in sewage pumping stations working at capacity, which placed a strain on the town’s sanitary sewer system due to the infiltration of stormwater.

Phase 3 of the project is set to increase storage capacity of the system by 60,000 m3.

Figure 7-1: Lorne Street Naturalized Stormwater Management Pond (Town of Sackville, 2019)

 

   Financial support for this project was provided in part by Natural Resources Canada through the Flood Hazard Identification and Mapping Program (FHIMP). We also gratefully acknowledge the funding and support provided by the Government of Nova Scotia through the Municipal Flood Line Mapping Program (MFLMP).